Projects

Here you can manage all projects within your domain:

  • Create project – to create a project, enter its name and GUID.
    • The name can be changed at any time
    • The GUID must be unique and must match the GUID of uploaded `.data` files

After selecting a project, additional options will appear:

  • Edit project – allows you to change the project name and set GPS coordinates for map display in Mervis.

  • Delete project – deletes the project. Requires a confirmation in a popup window!
  • Start project – the project will be activated with the status LocalRun
  • Stop project – the project will be stopped and set to status Stopped
  • Project files management – allows working with project files
  • Change Scada permissions – set access rights for the project

This dialog is used for uploading project files. The process is as follows:

  1. Prepare the files you want to upload
  2. Select the files using Select project files/folders to add, or use Drag and drop directly into the empty window
  3. Files will be color-coded by extension. Unsupported file types will turn bright red and will not be uploaded to Mervis
  4. For schemas, you can enter a Name and set the Order in which they will be displayed
  5. Upload project files uploads the files to Mervis
  6. Apply changes performs all necessary operations to activate the project in Mervis

Additional options:

  • Clear project files – clears files prepared for upload. This does not delete the project from Mervis!
  • Download project files – downloads the current project. Useful for creating a backup before updating
  • Delete selected files – during upload, this removes selected files. Use this option, for example, to delete old schemas.
    • *Warning: this option will permanently delete selected files. ==== Change Scada permissions ==== Here you can configure access permissions for the selected project: * View – allows viewing the project * Control – adds control functionality. Buttons are active. You can set up schedules * Manage – allows uploading and restarting projects Permissions must be combined. To enable control, the user must have both View and Control** rights.

  • © Energocentrum Plus, s.r.o. 2017 - 2025