Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
en:mervis-analytics:50-data-for-hvac-analytics [2020/04/08 14:30]
j.siroky [Air handling unit]
en:mervis-analytics:50-data-for-hvac-analytics [2020/04/08 16:02] (current)
Line 1: Line 1:
 ====== Data for HVAC analytics ====== ====== Data for HVAC analytics ======
 ==== General information ==== ==== General information ====
-Building operation is (or at least shall be) determined by a schedule. Therefore we need some information about regimes in the building (at least non-stop operation vs. office hours determined operation). This applies to all analytical topics listed below. +Building operation is (or at least shall be) determined by a schedule. Therefore we need some information about regimes in the building (at least non-stop operation vs. office hours determined operation). We do not read this information directly from BMS. It shall be defined by facility management in order to validate BMS setting. This applies to all analytical topics listed below. 
  
-We do not require outdoor temperature, we use independent data source. +We do not require outdoor temperature (humidity, pressure,...), we use independent data source. 
  
 Bellow is a list of recommend variables for each analytical topic. Bellow is a list of recommend variables for each analytical topic.
  • © Energocentrum Plus, s.r.o. 2017 - 2024