To execute the compiled program in a PLC, a runtime (RT) is necessary. The runtime must be up-to-date with the version of the editor (Mervis IDE). A new PLC which comes from the production may not be loaded with the most recent version of RT, and thus it is necessary to update the runtime before a project is uploaded to the PLC. A red triangle at the version number in the list of found PLCs indicates an obsolete version of the runtime.
RT update is possible if a PLC is reachable over TCP and its platform is correctly attached.
Update the runtime by right-click on the controller, select “PLC Operation” and „Upload RT“. The controller is restarted automatically after the new version of RT is uploaded.